Within the past year we had a client request that we use Serengeti for our electronic billing, and as such, we started using Activity Codes to bill them. So in Task Lists I entered them (for example) as: Nickname 1. Appear for/Attend and Nickname 2. A109 (etc).; and in the Client References I have them entered as Nickname 1. L101 and Nickname 2. L101. It works great. Recently, we had another client ask us to use Corridor. And instead of using Activity Codes, they want to use the Project Code Set (and in looking through it, I believe we'll mostly use P300 Structure/Strategy/Analysis). Do I enter P300 in the Task List as Nickname 1. Structure/Strategy/Analysis and Nickname 2. A300 OR do I set it up as a Reference? And if so, what do I use for the task? Thanks!
↧